top of page
IHC Construction

Start of work-Mount Prospect-Work Inside Structure UDP 11A

IHC will start work at the structure on 05/19/2023. The current plan is to complete the entire work by 05/24/2023

This work includes the daily closure of Isabella Street right by the intersection with Rand Rd. The road will be closed between 7:00 PM and 3:30 PM. The road is closed only by intersection. All residents near the site will have an unobstructed entrance to their properties.

Please see the traffic control plan:


11 views0 comments

Recent Posts

See All

Comments


bottom of page